And Then There Were None - Royal and Derngate

Role

Construction Draughtsperson

Location

Royal and Derngate, Northampton (plus tour)

Premiere

03.09.21

Director

Lucy Bailey

Designer

Mike Britton

Lighting Designer

Chris Davey

Construction Draughtsperson - I had originally worked on this before Covid. The designs included metal work widows and doors and a more elaborate ceiling piece. After Covid the designer redesigned it for a much smaller budget, I had to redesign the construction for timber and ply only due to workshop limitations, taking into consideration the break-up for a small transit van with reduced crew on tour to build. For the trucked ramp up stage, my brief was to make it easy to build, with 2 people in 30mins max. They achieved a 20min build and strike time.